Infographic: A case study of wastewater plant optimization

Aug. 12, 2016

This infographic highlights information on the Keswick Water Resource Recovery Facility’s wastewater plant optimization case study.

The below infographic highlights information on the Keswick Water Resource Recovery Facility’s wastewater plant optimization case study. The full story is available here.

Sponsored Recommendations

Meet the future of MV switchgear

SureSeT new-generation metal-clad. Smarter. Smaller. Stronger.

A digital circuit breaker built for the future

EvoPacT medium voltage digital vacuum circuit breaker

The New Generation of Intelligent MV Switchgear

Step into the future of electrical infrastructure with Intelligent MV Switchgear - where traditional equipment becomes smart, providing real-time data on critical components like...

Switchgear goes digital with SureSeT

Discover what you can do with Square D natively digital MV metal-clad switchgear.