EPA proposes plan to clean up release of sediment at Superfund site

March 1, 2013

SEATTLE — The proposed plan calls for cleanup of the most contaminated sediment and would reduce PCB contamination in the Duwamish River.

SEATTLE — The Environmental Protection Agency (EPA) released a proposed plan to clean up the Lower Duwamish Waterway Superfund Site, the city’s chief industrial waterway located on the south end of Elliott Bay, according to a press release.

The release of the sediment cleanup plan marks the beginning of a public comment period.

“The Duwamish is Seattle’s river. This plan is the product of our close coordination among the governments and businesses responsible for cleanup, and the communities and tribes who use the river for their food and livelihood,” said Dennis McLerran, regional administrator for EPA Region 10. “This cleanup will ensure that the Duwamish will be healthier and safer for the people and communities who rely on it, while also keeping the river open for business.”

[Related content: EPA proposes cleanup plan to remove contaminated sediment from canal in New York]

The proposed plan calls for cleanup of the most contaminated sediment and would reduce PCB contamination in the Duwamish River by at least 90 percent in conjunction with cleanups already underway at early action sites, stated the release.

The plan also includes an environmental justice analysis that examines the impacts of contamination on minority and low-income populations around the Superfund site.

In addition, the plan has a source control strategy to minimize the release of pollutants that could re-contaminate waterway sediments.

Read the entire press release here.

Sponsored Recommendations

NFPA 70B a Step-by-Step Guide to Compliance

NFPA 70B: A Step-by-Step Guide to Compliance

How digital twins drive more environmentally conscious medium- and low-voltage equipment design

Medium- and low voltage equipment specifiers can adopt digital twin technology to adopt a circular economy approach for sustainable, low-carbon equipment design.

MV equipment sustainability depends on environmentally conscious design values

Medium- and low voltage equipment manufacturers can prepare for environmental regulations now by using innovative MV switchgear design that eliminates SF6 use.

Social Distancing from your electrical equipment?

Using digital tools and apps for nearby monitoring and control increases safety and reduces arc flash hazards since electrical equipment can be operated from a safer distance....