$45 million oil pipeline poses problems for Alabama drinking water

July 2, 2013

MOBILE, Ala. — A portion of the $45 million pipeline would run through the watershed draining into Big Creek Lake.

MOBILE, Ala. — A proposal for a 45 mile long oil pipeline going through parts of Mobile County, including through a local watershed, has officials concerned, according to Fox 10 TV News.

A portion of the $45 million pipeline would run through the watershed draining into Big Creek Lake, which is the drinking water supply for Mobile, Ala., noted the article.

"We think the risk to our drinking water supply is non-negotiable," said Mobile County Commissioner Connie Hudson. 

Officials said Mobile County drinking water supply is something they’ve tried hard to guard and protect and will continue to do so, stated the article.

"If we can mitigate or eliminate the risk to our drinking water supply, that's our goal," Hudson said. 

Read the entire article here.

Sponsored Recommendations

NFPA 70B a Step-by-Step Guide to Compliance

NFPA 70B: A Step-by-Step Guide to Compliance

How digital twins drive more environmentally conscious medium- and low-voltage equipment design

Medium- and low voltage equipment specifiers can adopt digital twin technology to adopt a circular economy approach for sustainable, low-carbon equipment design.

MV equipment sustainability depends on environmentally conscious design values

Medium- and low voltage equipment manufacturers can prepare for environmental regulations now by using innovative MV switchgear design that eliminates SF6 use.

Social Distancing from your electrical equipment?

Using digital tools and apps for nearby monitoring and control increases safety and reduces arc flash hazards since electrical equipment can be operated from a safer distance....